1. Ensure wall penetration is
correct size. Penetration size for this type of installation should only
be 10mm larger than width and height dimension. As per AS1530 Test No.
FSV0538.
2.
Remove flange screws and detach flanges from casing.
3.
Apply a 20mmx 6mm bead of fire rated mastic to base of penetration.
Apply a 6mm bead of fire rated mastic to both edge faces of plasterboard
surface (see illustration).
4.
Slide damper into penetration and apply a 5mm bead of fire rated mastic
into side gaps. Apply a 10mm x 5mm x 2 beads of fire rated mastic in gap
above damper (see illustration) . Intumescent slats shall be in the
VERTICAL position.
NOTE: "AIRFLOW" direction is optional.
5.
Replace flanges with a bead of fire rated mastic around penetration
where angels seal against plasterboard. NOTE: Do not overtighen flange
screws.
6.
Connect ductwork to fire damper using fire rated mastic to fill
recess if using raw edge connection, or apply mastic to both surfaces of
the TDF flange connections. (Bolts must be of a low melting point
material.)
|