|

[ Printer
Friendly Adobe PDF File ]
1. Before sliding Damper into
duct, carry out an initial damper check. Check for any damage to module
though poor transport or mishandling.
2.
If damper is in sound condition slide into ductwork ensuring intumescent
strips are positioned within the wall.
3.
Using the pre-punched holes contained within the modules casing as a
guide, drill 1/8" fixing holes into duct. Fix damper using
1/8" steel rivets and seal any gaps between module and duct casing
with intumescent mastic.
4.
Using high temperature ceramic fibre wrap strip, pack the void around
ductwork as per diagram.
5.
Leave a minimum 20mm recess in front of this packaging which you solidly
fill with intumescent mastic. Ensure a small bead of mastic is applied
to the wall surface where the covering angles meet with the masonry
wall.
6.
Attach 25mm x 30mm x 0.7mm galvanised steel surround angles to duct
using 1/8" steel rivets, covering the intumescent mastic filling.
|