1. INITIAL DAMPER TEST - Before
installing damper into plenum, check damper closing operation. This can
be achieved by sliding the closed damper blades towards the centre
channel, then pivoting the blades upwards. Hold the two blades with one
hand and supporting the frame on a solid surface, release the blades
(USE CAUTION) to allow them to snap shut to the closed position.
2.
Manufacture of duct dropper / plenum in 0.7mm galv. steel as per
AS4254-1995.
3.
Check there is a 3mm maximum clearance between damper frame and the
ducts inside surface prior to securing damper.
4.
Drill holes to suit pre-punched holes in the damper frame, then secure
with 5mm dia. tubular STEEL rivets. Seal any gaps with an approved fire
rated mastic.
5.
Plenum or Duct droppers must be firmly secured to the slab,
floor/ceiling or roof above, independently from the suspended ceiling
itself.
6. 'F'-0.7mm retaining angles are mandatory if grilles or
diffusers are manufactured from aluminium or plastic.
7.
Once damper is installed REPEAT INITIAL DAMPER TEST as outlined in point
#1 to ensure proper closing operation. Re-fit UL33 fusible link setting