1. INITIAL DAMPER TEST -
Before installing Damper into wall, check damper's closing operation.
This can be achieved by removing UL33 rated fusible link. Hold the
damper in a stable upright position, then using the link strap or the
"cricket bat", push the blade vertically to the top. This will
clear the blade over the two locking tabs. Pivot the blade back against
the stainless steel spring(s) to the fully open position, then let the
blade close and lock. Replace fusible link and close link strap.
2.
Advise builder of damper location and direction of airflow.
3.
Damper should be laid on a 3mm t0 4mm thick mortar bed to ensure
airtight seal. NOTE: Dampers are clearly labelled with
"AIRFLOW" direction and "TOP" of unit.
4.
Complete brickwork around and over damper, filling gap between brickwork
and damper with a thin layer of mortar.
5.
Repeat INITIAL DAMPER TEST as outlined in point
#1.
6.
Connect ductwork to fire damper using fire rated mastic to fill
recess if using raw edge connection, or apply mastic to both surfaces of
the TDF flange connections. (bolts must be of a low melting point
material.)
|