1. INITIAL DAMPER TEST -
Before installing Damper into wall, check damper's closing operation.
This can be achieved by placing damper in the upright position. Hold
blade stack whilst removing UL33 rated fusible link. Let the curtain
blade stack fall. Gather blades up and return fusible link to its
original position.
2. Advise builder of penetration construction detail. Refer
figure 1.
3.
Ensure that penetration is correct size. Opening should be 16mm on top
of damper and 10mm on either side of damper.
4.
Remove flange screws / bolts and detach flanges from damper casing.
5.
Apply a 5mm bead of fire rated mastic along bottom and both side edges
of penetration. Slide damper into wall.
6.
Insert 27mm Nom. Diameter IBS Rod from fyregard into the 16mm expansion
gap on top of the damper. Seal both edges with another 5mm bead of fire
rated mastic.
7.
Seal all angles to plasterboard wall surface with fire rated mastic.
replace flanges making sure damper is fixed firmly within the wall.
NOTE: Do not overtighten flange screw bolts.
8.
Repeat INITIAL DAMPER TEST as outlined in point #1.
9.
Connect Ductwork to fire damper using fire resistant gap mastic to fill
recess if using raw edge connection, or apply mastic to both surfaces of
the TDF/TDC flange connections. (Bolts must be of a low melting point
material.)
|